Apr 10, 2014
Here are few photos of the before and after works of the dock.
Before
After
New line marking and new gate.
Armco barriers for safety walkway.
High speed action door with pin pad, UPS back up and fire mode.
With the new upgrade, now it's much more visible to pedestrians and vehicles passing through the dock.